Transportation Projects

(DDOT) Frederick Douglass Memorial Bridge

($441 million design-build project in Southeast DC)-Professional engineer in charge of QC team including staff training, special testing, engineering recommendation, and maintaining an AASHTO-certified lab.

(VDOT) Transform I66 Outside the Beltway

(Design Build Project)-Quality control laboratory professional engineer in charge of soil, concrete, and asphalt laboratory tests. Managed a quality control team of about 15 field inspectors providing technical support, and reviewing field performance and field reports.

(DDOT) I295/Malcolm X Interchange Improvements

(Design Bid Build Project)- Professional engineer in charge of QC including Soil Lime Treatment, Tieback Installation, and Paving.

(VDOT) Balls Ford Road

Manassas, VA, ongoing project. Realign about 1.9 miles of Balls Ford Road, between Devlin Road and Doane Drive. It was worked as the QC project professional engineer in charge of field inspectors daily, providing technical support, and reviewing field performance and field reports.

(VDOT) Route 28 (Centreville Rd) Widening

Fairfax County, VA, Ongoing project. Widening from four to six lanes between the bridge over Bull Run (south of Compton Road) and the interchange at Route 29 in Centreville. QC project professional engineer in charge of field inspectors in a daily basis, providing technical support, review field performance and field report.

(VDOT) Route 606 Reconstruction and Widening

Loudoun County, project value $106.1 Million, (2015 to 2017). Widening 5.3 miles roadway between Evergreen Mills Roads and the Dulles Greenway from two to four lanes. Worked with QC team, providing geotechnical recommendations, review field performance and field report.

(VDOT) Belmont Ridge Widening from Hay Road to Gloucester Parkway

Loudoun County, Project Value $ 77.0 Million (2016 to 2019). Widening two-lane to four-lane median-divided roadway including new bridges over the Washington & Old Dominion (W&OD) trail, 3,200 linear feet of noise barrier wall, parking area and shared-use paths on both side of roadway. Worked as a part of QC team to provided geotechnical investigation as well as construction material testing (field & Laboratory).

(VDOT) Route 7/Belmont Ridge Road Interchange

Loudoun County, Project Value $48.3 million (2015 to 2018). Worked as a part of QC team to provided geotechnical recommendation for drilled pile foundation as well as testing and inspection services.

(VDOT) I-66 Widening

Prince William County, project value $ 73.5 Million, (2014 to 2016). Worked with QC team of project management to provide field material testing and inspection services.

(VDOT) Route 606 Reconstruction and Widening

Loudoun County, project value $ 77.0 Million, (2015 to 2017)

(VDOT) Route 50 Widening

Fairfax & Loudoun County, project value $ 94.9 Million, (2011 to 2015). Quality control material (concrete, soils & aggregate) including laboratory testing services

(VDOT) Route 24/244 Interchange

Arlington County, project value $ 48.5 Million, (2012 to 2015). QC team project engineer in charge, providing geotechnical recommendations, reviewing field performance and field reports.

(VDOT) Route 7 Truck-Climbing Lane and Operational Improvement

Loudoun County, project value $ 36.4 Million, (2014 to 2015). Provided technical support of testing & inspection with QC team.

(VDOT) Gloucester Parkway Extension

Loudoun County, project value $ 29.7 Million, (2014 to 2016). Provided technical support of testing & inspection with QC team.

(VDOT) I-495 North Shoulder Lane Use

Fairfax County, project value $ 20 Million, (2014 to 2015). Provided technical support of testing & inspection with QC team

(VDOT) Route 29 Over Little Rocky Run

Fairfax County, project value $ 17.7 Million, (2014 to 2015). Provided technical support of testing & inspection with QC team